Location: Dallas, TX

Description: 360 (approximately 25,000 linear feet) drilled foundations from 24” to 36” in diameter. Depths varied from 40’ to 80’. The scope included drilling using slurry, setting temporary casing, placing steel, and assisting in pouring drilled shaft foundations for new facilities at an active waste water treatment plant.

Owner: Trinity River Authority

Contractor: MWH Constructors


 